| | |
|
|
|
|
Attaching the stations to the strongback Viewed: 775 times.
|
| Bracing the stations Viewed: 713 times.
|
| Attaching the planks along the centerline Viewed: 750 times.
|
|
| | |
| | |
|
|
|
|
Attaching the battens to the stations Viewed: 778 times.
|
| All the battens on and ready for fairing. Viewed: 853 times.
|
| Don screwing in a metal band. Viewed: 710 times.
|
|
| | |
|
|
|
The finished 20-foot canoe mold. Viewed: 652 times.
|
|
|